precautions
Before use, stir component A (paint) up and down, then add component B (curing agent) and stir well, and add an appropriate amount of diluent. Stir evenly, let it mature for 15-30 minutes, filter it with 120 mesh, and then apply.
The tools used during construction must be kept dry and clean.
The surface to be coated must be cleaned thoroughly, free from water stains, grease, and debris.
The relative humidity during construction and drying curing period shall not exceed 85%.
Open flames and smoking are prohibited on the construction site.
This product is a flammable liquid, and storage and handling should be handled in accordance with relevant regulations.
Bridges, ships, engineering machinery, exterior walls of buildings, metal structures of factories and mines, colored steel plates, etc.
Color and appearance
Various colors, matte, semi matte, medium gloss, high gloss
Construction precautions
Density 1.51g/m3
Ratio A: B=10:1
Dry film thickness 30 μ m
Theoretical coating amount 10 m2/kg
Suggested number of coating layers
1-2 tracks
Front supporting paint
842 cloud iron epoxy anti rust paint